615 657 $
Flat with 1 bedroom in Larnaca, Cyprus
Larnaca, Cyprus
This project is located in the Mackenzie area! Coming soon to Larnaca's most famous neighborhood, it will feature one bedroom apartments and a three bedroom penthouse wit...
Flat in Larnaca. City - Mackenzie
Apartments in Larnaca: 3 bed., 110 m², 4 min walk to the sea.
Luxurious project with sea view in the prestigious Mackenzie area. Within walking distance — a Blue Flag beach. Residents have access to a pool, gym, and concierge. Penthouses have rooftop terraces.
Apartment B301 in the "Plus 21 Residence" project: bedrooms: 3, bathrooms: 3, internal area 110 m², total area 155.94 m², covered veranda 28 m², communal pool, building floors: 7.
Status: ready to move in.
View: City.
Distances: 300 m to the sea as the crow flies, 4 min walk to the sea, 8 min drive to school, 5 min drive to shop, 9 min drive to hospital.
In Cyprus a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Mackenzie; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Cyprus finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Cyprus takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Mackenzie short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (613 479 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Mackenzie: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).