Main Countries Buy Rent

House 600 м² in Cannara, Italy

19 298 $

32 $ /м²

4OVD3
Share:

Area

600 м2

Bedrooms

8

Bathrooms

8

Luxurious 8-bedroom house for rent in Biarritz, France

Luxurious 600m² house on two levels with 8 bedrooms, each equipped with a bathroom and shower, toilet, TV, and wardrobe. In 3 bedrooms located on the second floor, there is air conditioning. Two large living rooms, open kitchen with freezer and beer pump, gym with shower and toilet, laundry room, garage, and cold room. Beautiful terrace in the backyard with a heated swimming pool and grill area. Possibility to park several cars on the property. Just 3 km from the center of Biarritz and the beach. Shops of Docks de Biarritz are only 1 km away.

Additional details

Property type

Residential Properties

Object type

House

Price

19 298 $

FAQ

In Italy a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Cannara; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Italy finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Italy takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Cannara short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (19 298 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Cannara: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections