Main Countries Buy Rent

Villa 400 м² in Sanur, Indonesia

1 292 $

3 $ /м²

4ObFv
Share:

Area

400 м2

Bedrooms

4

Bathrooms

3

4-bedroom villa in North Sanur

Family-friendly offer. Beautiful villa design will provide you with comfort. Large kitchen and refrigerator for ample food supply. Spacious living room and master bedroom, as well as its bathroom. Walking distance to the beach. If you are interested, feel free to contact us for a viewing. Thank you.

Services and facilities

Pool

Additional details

Property type

All Types

Object type

Villa

Price

1 292 $

Condition

Furnished

Characteristics

Pool

FAQ

In Indonesia a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Sanur; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Indonesia finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Indonesia takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Sanur short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (1 292 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Sanur: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections