Main Countries Buy Rent

Villa 350 м² in Canggu-North, Indonesia

2 325 $

6 $ /м²

4ObEL
Share:

Area

350 м2

Bedrooms

3

Bathrooms

3

Villa with 3 bedrooms in Canggu

Located in the Kanggu area - 10 minutes to the beach 3 bedrooms with bathroomsClosed living roomFully equipped modern kitchenPrivate pool 8x4 meters350 sqm land/280 sqm buildingStorage/staff roomPrivate garageExcluding monthly maintenance and electricity billsFeel free to contact us to schedule a viewing, thank you!

Services and facilities

Pool

Additional details

Property type

All Types

Object type

Villa

Price

2 325 $

Condition

Furnished

Characteristics

Pool

Infrastructure

Open pool

FAQ

In Indonesia a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Canggu-North; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Indonesia finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Indonesia takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Canggu-North short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (2 325 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Canggu-North: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections