New, completely ready to live in Design, furniture, appliances KDV and Trafo paid Title ready Generator in the complex Convenient location (near school and Near East Hospital)Cherkas Darya
Services and facilities
Air conditioner
Street window
Balcony or terrace
Internet
Furniture
Household appliances
Additional details
Property type
Residential Properties
Number of rooms
4
Floor
1
Object type
Villa
Price
391 654 $
Condition
In Good Condition
Location
In the Mountains
Characteristics
Air conditioner
Street window
Balcony or terrace
Internet
Furniture
Household appliances
Infrastructure
Open pool
Indoor pool
Children pool
Playground
Fitness center
Wi-Fi
Surveillance
Backup power generator
Purchase method
Cash
FAQ
In Cyprus a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Enibogazichi; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Cyprus finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Cyprus takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Enibogazichi short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (391 654 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Enibogazichi: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).