Main Countries Buy Rent

House 238 м² in Comport, Portugal

1 718 312 $

7 219 $ /м²

4OZjU
Share:

Area

238 м2

Bedrooms

3

Bathrooms

3

Luxurious 3-bedroom detached house in Comporta, Portugal

Charming traditional villa located in the village of Posanco, Herdade da Comporta, with an area of 238 sqm on a plot of 1,172 sqm. The house consists of 3 bedrooms, one with a bathroom, 2 bathrooms, kitchen, and living room. There is a beautiful and spacious open terrace with a very comfortable and charming dining and living area. There is also an attic with 2 rooms, 1 bathroom, and a zone that can be used as a guest lounge terrace. Located in a very quiet area, just 3 km from Comporta beach, this is the perfect holiday home, very authentic and with potential for exploration.

Additional details

Property type

Residential Properties

Object type

House

Price

1 718 312 $

FAQ

In Portugal a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Comport; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Portugal finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Portugal takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Comport short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (1 718 312 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Comport: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections