Main Countries Buy Rent

Flat 55 м² in Barga, Italy

170 021 $

3 091 $ /м²

4Ofhj
Share:

Area

55 м2

Bedrooms

2

Bathrooms

1

Two bedroom apartment near the beach

Apartment with two bedrooms near the beach, Ilino
Apartment area 55m2
Structure of the apartment: hallway, living room-kitchen, 2 bedrooms, bathroom, terrace.
A bright modern apartment is located on the 6th floor of a multi-storey new house.
The apartment is fully equipped with all the necessary furniture, appliances, air conditioning.
Warm, dry and bright apartment, there is an elevator.
On the territory of parking on the beach with a clean and road.

Services and facilities

Furniture
Air conditioner
Lift

Additional details

Property type

Residential Properties

Object type

Flat

Price

170 021 $

Characteristics

Furniture
Air conditioner
Lift

Distance to key points, m

To sea 400

FAQ

In Italy a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Barga; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Italy finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Italy takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Barga short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (170 021 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Barga: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections