Main Countries Buy Rent

Flat 85 м² in Blanes, Spain

256 542 $

3 018 $ /м²

4OUm4
Share:

Area

85 м2

Bedrooms

3

Bathrooms

1

Apartment for sale in Blanes, Spain

The apartment, completely renovated and brand new, is sold furnished. It consists of a spacious living room with a very bright open-plan kitchen with large windows, two double bedrooms, one single bedroom and a bathroom.The apartment has parquet floors, built-in closets, double glazed and heated aluminum windows, electric heating with radiators and elevator.It is located in the heart of the town of Blanes, just 200 meters from the beach, so no transportation is required to get around the town. Close to stores, schools, pharmacies, restaurants, public transportation, etc'.

Services and facilities

Lift

Additional details

Property type

Residential Properties

Object type

Flat

Price

256 542 $

Characteristics

Lift

FAQ

In Spain a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Blanes; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Spain finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Spain takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Blanes short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (256 542 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Blanes: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections