Main Countries Buy Rent

Flat 120 м² in Kalp, Spain

232 607 $

1 938 $ /м²

4Oajq
Share:

Area

120 м2

Bedrooms

3

Bathrooms

2

Apartment in Valencia and Murcia. City - Calpe

Very bright, fully renovated and furnished! Very large apartment, looks like two apartments! Very quiet neighbors. The building is completely renovated! Close to all services, beaches, etc. 2nd floor with elevator. There is heating. The size of the apartment is 120 square meters. 3 bedrooms, 2 bathrooms, living room, separate kitchen. Terrace. 300 meters from the beach. Annual property tax IBI is 450 euros per year. Utility payments - 700 euros per year. Close to the beach. View to the sea. Close to stores. Terrace. Furnished. Renovated. Furnished kitchen.

Additional details

Property type

Residential Properties

Object type

Flat

Price

232 607 $

FAQ

In Spain a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Kalp; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Spain finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Spain takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Kalp short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (232 607 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Kalp: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections