Main Countries Buy Rent

Flat 245 м² in Kalp, Spain

583 272 $

2 380 $ /м²

4Ob4q
Share:

Area

245 м2

Bedrooms

4

Bathrooms

3

Apartment in Valencia and Murcia. City - Calpe

This residential complex with a total area of 245 sq. m occupies the 21st and 22nd floors, offering a stunning view of the sea and the symbolic mountain of Ifach on one side, as well as the city landscape and natural park on the other side. The lower floor features a spacious and bright living room with access to a large terrace, three bedrooms, two bathrooms, an additional separate bathroom, and a kitchen with access to a second terrace. The upper floor includes a living room/kitchen with access to a terrace, a bathroom, and a spacious bedroom with access to two terraces on different sides.

Additional details

Property type

Residential Properties

Object type

Flat

Price

583 272 $

FAQ

In Spain a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Kalp; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Spain finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Spain takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Kalp short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (583 272 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Kalp: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections