172 781 $
Flat with 1 bedroom in Bogaz, Cyprus
Bogaz, Cyprus
North Cyprus real estate: studio by the sea in Boaz with a terrace and Mediterranean Sea view North Cyprus real estate continues to attract investors and buyers thanks to...
Modern apartments in a residential complex from the developer in Boaz (005193)
The complex is located in the Boaz area. Near supermarkets, excellent restaurants and cafes, beaches where you can enjoy crystal clear waters and beautiful sunsets.
This wonderful project, located by the sea with its uniqueness, is waiting for you with attractive prices and flexible payment options. With its sun, sea and unique beach, the project invites you to experience peace, serenity and comfort together during your stay.
The complex consists of 6 buildings with the following apartments:
Area from 48 m2.
Distance to the sea 600-800 meters.
Infrastructure of the complex:
Price:
Construction start date: autumn 2023
Construction completion date: 12.2025
In Cyprus a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bogaz; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Cyprus finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Cyprus takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bogaz short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (170 528 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bogaz: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).