133 057 $
Flat with 1 bedroom in Bogaz, Cyprus
Bogaz, Cyprus
North Cyprus Real Estate: modern studio in Boaz in the Long Beach Iskele area Looking for North Cyprus real estate by the sea, a studio in North Cyprus for investment, or...
Caesar PALM JEMEIRAH district Bogaz'.
The analog of Dubai at the best and affordable prices.
The perfect location and infrastructure for the perfect life.
Ideal installment terms and guaranteed rental income
Kitchen furniture: kitchen cabinets to the ceiling,
tops made of artificial stone
- Equipped bathroom:
water closet,
wall-hung toilet,
sink with vanity unit and mirror,
shower cubicle,faucets, 4-
shower mixer
- Underfloor heating in bathrooms
rooms
- Ceramic flooring (2 variants)
down payment
36% until you get the keys
24% is covered by the guaranteed rent of the apartment
(3 years guaranteed rent, 8% per annum)
In Cyprus a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bogaz; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Cyprus finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Cyprus takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bogaz short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (133 928 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bogaz: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).