Main Countries Buy Rent

Flat 52 м² in Dobrota, Montenegro

199 355 $

3 833 $ /м²

4Odw5
Share:

Area

52 м2

Bedrooms

1

Apartment in Kotor. The city is Dobrota.

Kindness. A functional one-bedroom apartment for sale in excellent condition, covering an area of 52 sq. m., with a beautiful view of the bay and mountains. Designer renovation, modern furniture and appliances, panoramic view, large terrace, parking available, located on the 1st floor.

Additional details

Property type

Residential Properties

Number of rooms

1

Floor

1

Object type

Flat

Price

199 355 $

Characteristics

Sea View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Dobrota; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Dobrota short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (199 355 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Dobrota: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections