Main Countries Buy Rent

House 194 м² in Bar, Montenegro

246 326 $

1 269 $ /м²

4OfdG
Share:

Area

194 м2

Bedrooms

6

House in Bar. The city is Bar

City of Bar, Shushan district.

The area of the house-194m2

Plot area-243m2

Two-storey house with two separate floors.

The structure of the first floor: kitchen, living room, three bedrooms, two bathrooms.

Second floor structure: three separate studios.

The house is equipped with all necessary furniture and appliances.

The house is equipped with all necessary furniture and appliances.

City water supply.

City water supply, city sewerage.

City water supply, city sewerage.

The house is submitted for legalization, there is a DUP.

The house is equipped with all necessary furniture and equipment.

Now there is a grocery store, bakery, school.

Additional details

Property type

Residential Properties

Number of rooms

6

Object type

House

Price

246 326 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (246 326 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections