Main Countries Buy Rent

Land 1 м² in Barga, Italy

257 963 $

257 963 $ /м²

4Ocig
Share:

Area

1 м2

Plot in Susanj

The plan includes three taunhaus, whose foundations are done, and the renders can be seen by pictures.




Each of them has two floors and a roof terrace with a staircase leading from home to it.




Each of the houses contains the following:


  1st floor (kitchen, living room with terrace, bathroom)


2nd floor (two bedrooms, bathroom, exit to the terrace)


3rd floor (open terrace on the roof)




The sea is about 400m away, and the terrace offers excellent views of the sea, the port and the center of Bar.




Houses are connected to city water and sewage. The access road is paved.

Additional details

Property type

Land

Object type

Land

Price

257 963 $

Land area

770

Distance to key points, m

To sea 400

FAQ

In Italy a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Barga; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Italy finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Italy takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Barga short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (257 963 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Barga: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections