For sale 2-bedroom apartment in a new building in Becici ID S4379
Sale Becici 4379. 2 bedroom apartment for sale in a popular residential complex in Becici. The apartment is located on the 3rd floor, fully furnished and ready to move in. It is possible to purchase a garage for an additional fee.
Services and facilities
Air conditioner
Lift
Street window
Balcony or terrace
Heating system
Internet
Furniture
Additional details
Property type
New Building
Number of rooms
3
Floor
3
Object type
Flat
Price
200 228 $
Condition
New Building
Characteristics
Air conditioner
Lift
Street window
Balcony or terrace
Heating system
Internet
Furniture
City View
Infrastructure
Open pool
Children pool
Kids playroom
FAQ
In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Becici; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Becici short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (200 228 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Becici: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).