Main Countries Buy Rent

House 403 м² in Dobrota, Montenegro

741 288 $

1 839 $ /м²

4Odvx
Share:

Area

403 м2

Bedrooms

4

Cottage in Kotor. The city is Dobrota.

Penthouse in Dobrota

Price 630,000 euros

Apartment of 403 m2, of which a four-room apartment of 200 m2 and a roof terrace of 203 m2 with installation for summer kitchen, Jacuzzi, TV, shower and a garage of 27 m2 for two cars

Gym for use

Open swimming pool (extra charge for sunbeds)

Building maintenance 0,35 €/m2

Building maintenance 0,35 €/m2

Additional details

Property type

Residential Properties

Number of rooms

4

Object type

House

Price

741 288 $

Characteristics

Sea View

Infrastructure

Open pool

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Dobrota; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Dobrota short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (741 288 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Dobrota: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections