Main Countries Buy Rent

House 285 м² in Torrevieja, Spain

2 314 126 $

8 119 $ /м²

4OV8X
Share:

Area

285 м2

Bedrooms

4

Commercial premises for sale in Torrevieja, Spain

Restaurant with full occupancy and high turnover is for sale due to illness. The building is only 8 months old. All licenses are available. The premises include a dining room, bar, one regular toilet and one adapted for people with limited mobility, equipped kitchen, forklift, basement with refrigerated chamber, separate storage room, beverage room, office, employee toilet, changing rooms, additional tables, dishwashers, and more.

Additional details

Property type

Commercial

Object type

House

Price

2 314 126 $

FAQ

In Spain a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Torrevieja; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Spain finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Spain takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Torrevieja short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (2 314 126 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Torrevieja: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections