Main Countries Buy Rent

House 73 м² in Bar, Montenegro

126 875 $

1 738 $ /м²

4Og5l
Share:

Area

73 м2

Bedrooms

4

Two-storey house in Sutomore, Brca

Two-storey house 73m2 on a plot of 221m2 in Sutomore, Brz.

On the first floor hallway, living room-kitchen, two bedrooms, bathroom.
On the second floor there is a similar layout.

In the house there is an external staircase.
On each floor there is a large terrace.
In the yard of the house there is a parking for 2 cars.

There is a land plot with decorative and fruit trees.
Near the oak grove, a beautiful view of the sea and the mountains.

Distance to the sea 10 minutes.

Documents submitted for legalization

To the house 50 meters gravel road

Additional details

Property type

Residential Properties

Floor

2

Object type

House

Price

126 875 $

Land area

221

Distance to key points, m

To sea 800

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (126 875 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections