Main Countries Buy Rent

House 2750 м² in Alcobasa, Portugal

3 542 957 $

1 288 $ /м²

4OV86
Share:

Area

2750 м2

Bedrooms

4

Slaughter yard in the Central Zone with warehouse and sector operator

The slaughterhouse in the Central Zone is fully operational. It has a license to slaughter 900 pigs per week and to store and process the meat. Fresh and frozen meat is sold, including sausages (traditional sausages). There are tunnels and chambers for canning and freezing. There is its own water pit, mini photovoltaic plant. A license for sewage treatment has been obtained. The surrounding area is equipped with additional green space. The construction will be completed on January 12, 2023. Areas: land plot 11000 m², total area 2750 m².

Additional details

Property type

Residential Properties

Object type

House

Price

3 542 957 $

FAQ

In Portugal a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Alcobasa; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Portugal finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Portugal takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Alcobasa short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (3 542 957 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Alcobasa: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections