Main Countries Buy Rent

Flat 70 м² in Bar, Montenegro

270 963 $

3 870 $ /м²

4Oiv7
Share:

Area

70 м2

Bedrooms

2

Apartment in Bar. City - Bar

description

Apartment with two bedrooms and sea views in Shushan


For sale is a fully furnished apartment of 70 m2 on the 5th floor of a new house with an elevator. The house was commissioned in 2026. To the beach Zhukortlitsa - 400 m on a flat road.


The apartment has a living room with a kitchen and dining area, two bedrooms, a bathroom and two spacious balconies with direct sea views. The apartment is equipped with home appliances and is ready for living.


For the apartment under a notarial contract, a parking space is fixed on a closed territory with a barrier.


Price: 240,450 €

Additional details

Property type

Residential Properties

Number of rooms

2

Floor

5

Object type

Flat

Price

270 963 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (270 963 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections