Main Countries Buy Rent

House 108 м² in Bar, Montenegro

87 004 $

805 $ /м²

4Odyi
Share:

Area

108 м2

Bedrooms

2

House in Catalonia. City - Barcelona

Description

Three-storey legal house with sea views in Shushini, Bar

House characteristics:

- house area 66m2 + garage 42m2 garage + terraces

- land area 200m2

House structure:

On the ground floor there is a garage and a separate room.

On the second floor there is a spacious terrace that can be converted into an apartment of 40 m2.

On the third floor there is an entrance hall, a living room combined with a kitchen, two bedrooms with terraces overlooking the sea, and a bathroom.

The third floor is furnished and ready to move in.

Water - reservoir, sewerage - septic tank.

Parking.

View of the mountains, city and sea.

Distance to the sea 15 0 0 meters.

Additional details

Property type

Residential Properties

Number of rooms

2

Object type

House

Price

87 004 $

Characteristics

Sea View
Mountain View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (87 004 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections