Main Countries Buy Rent

House 65 м² in Bar, Montenegro

112 579 $

1 731 $ /м²

4Oe1B
Share:

Area

65 м2

Bedrooms

2

House in Catalonia. City - Barcelona

One-story house with a large plot in Nizhny Zalyevo. The area of the house is 65 m². The area of the plot is 573 m². Structure: hallway, 2 rooms, living room, kitchen, bathroom. Utilities: electricity, city water. Parking in front of the house on the plot. The house is partially furnished. The plot is large and green. There is an orchard on part of the plot. The access road is paved. Quiet location. View of the mountains. There is another small building on the plot as an auxiliary structure. There is an option to buy an additional part of the plot with two more small buildings.

Additional details

Property type

Residential Properties

Number of rooms

2

Object type

House

Price

112 579 $

Characteristics

Mountain View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (112 579 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections