Main Countries Buy Rent

Flat 51 м² in Bar, Montenegro

194 147 $

3 806 $ /м²

4Oe4Q
Share:

Area

51 м2

Bedrooms

2

Apartment in Catalonia. City - Barcelona

Apartment in the city of Bar in a new building with a swimming pool, total area 51.35 m2. Structure: corridor, living room combined with kitchen and exit to the terrace, bedroom, bathroom. The main windows of the apartment are oriented to the southwest, and there is a window in the bathroom, which prevents the appearance of mold. Split system LG. Grohe plumbing. 300 meters to the sea. 200 meters to the sports center. Suitable for living and renting.

Additional details

Property type

Residential Properties

Number of rooms

2

Object type

Flat

Price

194 147 $

Infrastructure

Open pool

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (194 147 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections