Main Countries Buy Rent

Flat 83 м² in Bar, Montenegro

255 332 $

3 076 $ /м²

4Oes5
Share:

Area

83 м2

Bedrooms

2

Apartment in Catalonia. City - Barcelona

Apartment for sale in the city center of Bar, developed by the former Zib company, quality checked, with all infrastructure nearby. Second floor, 83 m2, 2 bedrooms, 2 bathrooms, 2 terraces. View of the mountains and the city. Spacious living room with access to the fireplace, kitchen separate from the living room and dining room. 10 minutes walk to the beach. Apartment price: 217,000 euros.

Additional details

Property type

Residential Properties

Number of rooms

2

Floor

2

Object type

Flat

Price

255 332 $

Characteristics

Mountain View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (255 332 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections