Main Countries Buy Rent

Flat 50 м² in Sozopol, Bulgaria

50 168 $

1 003 $ /м²

4OXWw
Share:

Area

50 м2

Bedrooms

1

Flats in a residential building

Present to your attention apartments in a new four-storey building, which is located in the area of Kavatsite, 5 minutes drive from the center of Sozopol.
Only a few apartments are left, of which two with sea view.
All apartments are completed "turnkey". Installed elevator.
There is ACT 15, before the end of the year is expected ACT 16.

'.

Additional details

Property type

Residential Properties

Floor

0

Object type

Flat

Price

50 168 $

Location

By the Sea

Characteristics

Sea View

Distance to key points, m

To sea 200

FAQ

In Bulgaria a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Sozopol; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Bulgaria finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Bulgaria takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Sozopol short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (50 168 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Sozopol: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections