133 524 $
Flat with 1 bedroom in Bar, Montenegro
Bar, Montenegro
A cozy apartment with a view of Soho City in Bar is for sale!Main information: • Price: 127,000 euros • Area: 49 m² • Floor: 2nd • Distance to the beach: only 350 metersA...
Apartment in Bar. City - Bar
Spacious studio with a panoramic view of the mountains in a modern premium complex in Bar.
8th floor (three elevators).
Apartment area - 40 m2
Apartment consists of a spacious living room combined with a kitchen, a bathroom and a terrace.
A beautiful view of the mountains (the east).
Apartment is very warm and cozy.
The apartment is equipped with a system /br> Park with a hotel accommodation in the hotel room for 24 meters />, a hotel room /br>, a hotel room with a hotel room for the hotel accommodation /br />>
Price - 120,000 euros
In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (133 524 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).