Main Countries Buy Rent

Flat 38 м² in Tivat, Montenegro

157 610 $

4 147 $ /м²

4OcmK
Share:

Area

38 м2

Bathrooms

1

Year of construction

2022

Studio in Sears complex

The studio is located in the new Sears complex, built in 2022

300 meters to the sea on a gentle road, convenient location near a school, shops, promenade and Porto Montenegro

Area 38 m2, second floor, the building has an elevator

The apartment is unfurnished, the building is ready to move in

Parking in front of the building

Services and facilities

Lift

Additional details

Property type

Residential Properties

Object type

Flat

Price

157 610 $

Characteristics

Lift

Distance to key points, m

To sea 300

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Tivat; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Tivat short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (157 610 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Tivat: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections