Main Countries Buy Rent

Flat 25 м² in Budva, Montenegro

83 251 $

3 330 $ /м²

4OclU
Share:

Area

25 м2

Bathrooms

1

Year of construction

2020

Studio with sea view

The studio apartment is located in a convenient area - near the HDL hypermarket, school, shops and cafes

Area 25 m2, 5th floor

Apartment in a building built in 2020, 5th floor with an elevator

Parking in front of the building

Sea view from the terrace

Services and facilities

Lift

Additional details

Property type

Residential Properties

Object type

Flat

Price

83 251 $

Characteristics

Lift

Distance to key points, m

To sea 500

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Budva; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Budva short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (83 251 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Budva: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections