Main Countries Buy Rent

Flat 100 м² in Athens, Greece

264 150 $

2 641 $ /м²

4OUqf
Share:

Area

100 м2

Bedrooms

3

Bathrooms

1

Lovely apartment in Kipseli'.

Apartment of 100 square meters, on the second floor, with two bedrooms, one bathroom, independent gas heating, air conditioning, solar heater, entrance door with security system, double-glazed windows, electric roller shutters, elevator, balconies, built in 1980, completely renovated.Price: 225 000 euros. Isqm Real Estate, tel: 2109718592, e-mail: info@isqm.gr

Additional details

Property type

Residential Properties

Object type

Flat

Price

264 150 $

FAQ

In Greece a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Athens; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Greece finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Greece takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Athens short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (264 150 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Athens: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections