Main Countries Buy Rent

Flat 90 м² in Voula, Greece

681 637 $

7 573 $ /м²

4OVSz
Share:

Area

90 м2

Bedrooms

2

| East Attica-Voula - 90 Sq.m, 2 Bedrooms, 580.000€

Voula, Kato Voula, Apartment for Sale, 90 sqm, Property Condition: Under Construction, Floor: 3rd, 1 Level(s), 2 Bedrooms, Heating: Independent, Features: Security Door, Burglar Alarm, Video Surveillance, For Investment, Luxury, Air Conditioning, Roadside, Light, On Highway, Air Conditioning, Solar Water System, Boiler, Rear Yard (Garden), Distance from: Primorski Krai (m): 50, Price: €580.000. REMAX PLUS, tel: 2109851222, e-mail: remax-plus@otenet.gr

Additional details

Property type

Residential Properties

Object type

Flat

Price

681 637 $

FAQ

In Greece a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Voula; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Greece finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Greece takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Voula short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (681 637 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Voula: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections