Main Countries Buy Rent

Flat 78 м² in Cremona, Italy

381 220 $

4 887 $ /м²

4OTfm
Share:

Area

78 м2

Bedrooms

2

Bathrooms

2

2-room apartment for sale in Benalmadena, Malaga, Andalusia, Spain.

New construction: Prices from €325,000 to €603,000. [Bedrooms: 2-3] [Bathrooms: 2-3] [Built size: 76m2 - 100m2]. This exclusive private building is located in a privileged location in Benalmadena. Due to its elevated position, all homes will enjoy incredible panoramic views of the sea and coastline. The terraced location of this building overlooking the Mediterranean Sea means that each of the 49 apartments and 2 townhouses enjoys bright rooms thanks to natural light. Property features: Covered terrace, Elevator, Fitted wardrobes, Private terrace, Solarium, Gym, Ensuite bathroom.

Additional details

Property type

All Types

Object type

Flat

Price

381 220 $

FAQ

In Italy a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Cremona; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Italy finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Italy takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Cremona short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (381 220 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Cremona: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections