Main Countries Buy Rent

Flat 74 м² in Mil-Palmeras, Spain

173 099 $

2 339 $ /м²

4OToG
Share:

Area

74 м2

Bedrooms

2

Bathrooms

2

2 bedroom penthouse apartment for sale in Mil Palmeras, Alicante, Valencia, Spain.

Mil Palmeras beach 500 meters away!!!' Rio Mar 6, corner bungalow on the top floor with private solarium facing south and overlooking the community pool, house of 61 m2 with 2 bedrooms, bathroom, American kitchen with closed gallery, living room, glazed terrace, 25 m2 private solarium, 2 storage rooms, this fabuloso penthouse is sold furnished and with air conditioning. Status: Alicante Price: 148 000 € Location: Mil Palmeras Type: Penthouse Living area: Beds: 2 Bathrooms: 2 House area: 61 m2 Plot area:

Additional details

Property type

All Types

Object type

Flat

Price

173 099 $

FAQ

In Spain a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Mil-Palmeras; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Spain finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Spain takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Mil-Palmeras short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (173 099 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Mil-Palmeras: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections