Main Countries Buy Rent

Flat 83 м² in Bar, Montenegro

257 154 $

3 098 $ /м²

4OcpT
Share:

Area

83 м2

Bedrooms

2

Bathrooms

2

Two bedroom apartment in the center

Apartment with two bedrooms and two terraces in the center of Bar.

Located on the 2nd floor.

Apartment area 83 m2.

Apartment structure: entrance hall, 2 bedrooms, 2 bathrooms, spacious living room with fireplace exit, separate kitchen, dining area, 2 terraces.

The apartment is sold fully finished.

The flooring is parquet, tiles.

The necessary plumbing fixtures are installed in the bathrooms.

Sold unfurnished.

Air conditioner.

View of the mountains, city.

Distance to the sea 1 km.

Services and facilities

Air conditioner

Additional details

Property type

Residential Properties

Object type

Flat

Price

257 154 $

Characteristics

Air conditioner

Distance to key points, m

To sea 1000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (257 154 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections