Main Countries Buy Rent

Flat 44 м² in Bar, Montenegro

99 069 $

2 251 $ /м²

4Octm
Share:

Area

44 м2

Bedrooms

1

Bathrooms

1

Year of construction

2026

Apartments from the developer in Celuga

Apartments from the developer in a multi-apartment residential building in Celuga.

Completion of construction work - July 2026.

On sale

One-bedroom apartments - 44 m2, 1,700 euros / m2

Two-bedroom apartments 72 m2, 1,700 euros / m2.

In total, the residential building is expected to have 5 residential floors and a ground floor with commercial premises.

The apartments will be delivered finished.

The bathroom will be equipped with the necessary plumbing.

Floor covering - ceramics, parquet.

Interior doors.

Air conditioners will be installed.

Distance to the sea 5 km.

Mountain view.

Services and facilities

Air conditioner

Additional details

Property type

Residential Properties

Object type

Flat

Price

99 069 $

Characteristics

Air conditioner

Distance to key points, m

To sea 5000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (99 069 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections