Main Countries Buy Rent

Flat 30 м² in Bar, Montenegro

117 319 $

3 910 $ /м²

4OgBx
Share:

Area

30 м2

Bathrooms

1

Year of construction

2023

Bright studio in a new building, 200 meters from the sea

Bright studio in a new building 200m from the sea, Bar


Apartment area 30m2

The apartment is located on the 5th floor of a new apartment building in the suburb of Bar Ilino.

Structure of the apartment: hallway, room with kitchen, bathroom, balcony.
The apartment is fully equipped with all the necessary new modern furniture.

In the bathroom warm floor.
Furniture on the balcony.
View of the mountains, the city.

All infrastructure is within walking distance.

To the sea and the beach only 200 m.

Services and facilities

Furniture

Additional details

Property type

Residential Properties

Object type

Flat

Price

117 319 $

Characteristics

Furniture

Distance to key points, m

To sea 200

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (117 319 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections