Apartment 2 + 1 in a luxury residential complex, Mahmutlar (05300)
The apartment in the residential complex (in block B, with an indoor pool): located in the center of the Mahmutlar district, on the main street of Barbarossa, just 250 meters from the sea.
The complex consists of 3 blocks of 12 floors each.2 of the apartment at the airport
Services and facilities
Balcony or terrace
Pool
Security system
Lift
Additional details
Property type
Residential Properties
Object type
Flat
Price
328 349 $
Characteristics
Balcony or terrace
Pool
Security system
Lift
Sea View
Infrastructure
Playground
Backup power generator
Distance to key points, m
To airport
250000
To sea
250
To center
120000
FAQ
In Turkey a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Mahmutlar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Turkey finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Turkey takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Mahmutlar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (328 349 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Mahmutlar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).