Apartments from the developer in one of the most attractive parts of the region - in the Cleopatra beach area (007455)
Our residential complex will be located in one of the most attractive parts of our region - in the Cleopatra beach area.
Location:
Construction will take place in the Mamadı / Büyükhasbahçe area. Behind the bypass road.
At the moment, there is no dense building in the area. Only low-rise buildings are allowed.
The area is loved for its silence, tranquility and the surrounding forest. Biyukkhasbahce is located on the slope of the Taurus Mountains, which provides a wonderful panoramic view of the sea, the fortress and the entire city.
- Distance:
- urban infrastructure (schools, hospitals, kindergartens, government institutions, etc.) are located within a radius of 700 meters.
- the distance from the building to Antalya Airport is 120 km,
- to Gazipasa airport 40 km,
- to the seaport of Alanya 2 km.
- to the central beach 1800 meters.
General characteristics:
The area of the territory is 2064 m².
The total number of apartments is 11.
Of them:
8 apartments with 2 + 1 layouts (79.2 - 117 sq.m.)
3 two-level (duplex) apartments - 3 + 1 (160.1-163 sq.m.)
Infrastructure:
- Open pool
- Children's pool
- Playground
- Fitness
- Sauna
- Lobby
- Covered parking
- Caretaker (kapidzhi)
- CCTV
- Generator
Specifications:
- satellite television system
- Wi-Fi network throughout the facility
- hydrophore
- reserve water tanks
- elevator
Flat:
- Household appliances (hood, hob, oven)
- Heated floor in the bathroom (electric)
- water heater
- Suspended ceiling
- Spots
- Wall covering - washable paint
- Floor covering - ceramic tiles
- kitchen set
- Complete bathroom with cabinets
- Allocated space for the installation of air conditioners
- Aluminum double-glazed windows
- Aluminum balcony railing + glass
Security and Environment:
- Fire exit/entrance and fire escape with direction signs for emergencies
- Video surveillance system
- steel doors
- Intercoms with video system
- Fire cabinets
- Collection area in case of emergencies
Construction start date: 05.2023
Construction completion date: 12.2024
Information updated: 12.08.2025