144 053 $
Flat with 1 bedroom in Bar, Montenegro
Bar, Montenegro
descriptionUrgent sale of an apartment in Bar in one of the best houses in the cityPrice: 130.000 €To the sea - only 350 meters! Apartment for sale in Montenegro, Bar Loc...
Apartment in Bar. City - Bar
Apartment for sale in construction - Bar, Shushan
One-bedroom apartment on a high ground floor with garage (parking space)
Location: Bar, Shushan - above the Anto Djedovic school, only 500 m from the sea, 300 m to the supermarket, 2 km to the city center (Bar).
Property description:
• Apartment area: 40 m2
• Additional area in front of the balcony: 16 m2
• Garage (parking space)
Building: High first floor + 5 floors
Completion of construction in the process
Price: 130,000 €
Contact us for more information or organization
In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (144 053 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).