Main Countries Buy Rent

Flat 44 м² in Bar, Montenegro

107 838 $

2 450 $ /м²

4Off6
Share:

Area

44 м2

Bedrooms

1

Apartment in Bar. City - Bar

Description

 One-bedroom apartment 44 m2 at the completion stage in the city of Bar, Cheluga district.
Completion of the house is scheduled for May 2024.
House with swimming pool.
Apartment planning: corridor, living room with kitchen and access to the terrace, bedroom, bathroom.
Middle floor, windows facing south.
The house has an elevator.
To the sea - 2000 meters.
Product store - 150 meters.
School - 500 meters.
From the bedroom windows and kitchen offers a beautiful view of the mountains.

Additional details

Property type

Residential Properties

Number of rooms

1

Object type

Flat

Price

107 838 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (107 838 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections