Main Countries Buy Rent

Flat 43 м² in Bar, Montenegro

108 771 $

2 529 $ /м²

4Oeye
Share:

Area

43 м2

Bedrooms

1

Apartment in Catalonia. City - Barcelona

Description

Apartment in a new building with a view of the sea and mountains in Bar

Key parameters:

  • Location: Bar
  • Property type: apartment
  • Apartment area: 43 m²
  • Floor: 2nd
  • Number of bedrooms: 1
  • Number of bathrooms: 1
  • View: mountains and city, from the bedroom - sea
  • Distance to the sea: 1500 m
  • Parking: next to the house

Additional options:

  • Warm floor
  • City water and sewerage
  • Water tank: 20 m³
  • Separate meter for each apartment

Furniture and household appliances: not specified.

Materials: not specified.

Communications:

  • City water
  • Sewerage

Additional details

Property type

Residential Properties

Number of rooms

1

Floor

2

Object type

Flat

Price

108 771 $

Characteristics

Sea View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (108 771 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections