Main Countries Buy Rent

Villa 260 м² in Bar, Montenegro

410 544 $

1 579 $ /м²

4OdyD
Share:

Area

260 м2

Bedrooms

5

Villa in Catalonia. City - Barcelona

Description


Designer villa in Ratac, Bar

Villa characteristics:

House area 260m2

Land area 800 m2

Structure of the house: spacious living room combined with kitchen, five bedrooms, five bathrooms, terraces overlooking the sea and mountains.

The house is fully furnished and equipped with all necessary appliances.

Heated floors and air conditioners are installed.

Fenced area, barbecue area, swimming pool, parking for several cars.

350,000 euros

Additional details

Property type

Residential Properties

Number of rooms

5

Object type

Villa

Price

410 544 $

Characteristics

Sea View
Mountain View

Infrastructure

Open pool

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (410 544 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections