Main Countries Buy Rent

House 102 м² in Bar, Montenegro

143 667 $

1 408 $ /м²

4Oj0Y
Share:

Area

102 м2

Bedrooms

3

House in Bar. City - Bar

Description of the object:
Two legal houses are located in Shushan 600 meters from the sea
On the site there are two buildings of 60 m2 and 42 m2
1 the house consists of a technical room, a summer kitchen (can be converted into a garage) on the first floor
The second floor: Living room, 2 bedrooms, a kitchen, a pantry, a bathroom and a corridor;
The house consists of a living room, 1 bedroom, a kitchen, a corridor and a bathroom on the first floor leads to the city's water supply /br2 There are two beaches, a market, a restaurant, a cafe.
The house has a parking space for one car.
The houses are legal, without encumbrances


Additional details

Property type

Residential Properties

Number of rooms

3

Object type

House

Price

143 667 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (143 667 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections