Main Countries Buy Rent

Villa 200 м² in Tepe, Turkey

763 603 $

3 818 $ /м²

4OfRI
Share:

Area

200 м2

Bedrooms

4

Year of construction

2025

Luxury villas in the paradise region of Tepe (008478)

Div>
Project features:

  • 8 garden duplexes 4+1 (4 at garden level, 4 from the roof) on an area of 1829 m²
  • Each garden duplex has its own swimming pool and garden. Common pool: 71 m² Common garden: 200 m²
  • Private pool:30 km/lip>

Services and facilities

Heating system
Balcony or terrace
Pool
Security system
Lift

Additional details

Property type

Residential Properties

Object type

Villa

Price

763 603 $

Characteristics

Heating system
Balcony or terrace
Pool
Security system
Lift
Sea View

Infrastructure

Playground
Backup power generator

Distance to key points, m

To airport 400000
To sea 4000
To center 30000

Purchase method

Installment plan

FAQ

In Turkey a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Tepe; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Turkey finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Turkey takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Tepe short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (763 603 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Tepe: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections