Main Countries Buy Rent

Land 1 м² in Zagradje, Montenegro

163 643 $

163 643 $ /м²

4OdPH
Share:

Area

1 м2

Plot for construction with sea views

The plot is located in Zagradje, 700 meters from the sea in a quiet green area

Area 1727 m2

The construction of a 15-storey building with a total area of up to 4317 m2 with a base of up to 690 m2 is allowed on the site

City water and electricity near the plot, access road

Great offer for investment, promising area

Additional details

Property type

Land

Object type

Land

Price

163 643 $

Land area

1727

Distance to key points, m

To sea 700

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Zagradje; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Zagradje short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (163 643 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Zagradje: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections