Main Countries Buy Rent

Land 1 м² in Zabljak, Montenegro

25 805 $

25 805 $ /м²

4OdsT
Share:

Area

1 м2

A plot of land near Žabljak, in the Palež area.

Land plot near Žabljak, in the Palež area.
Area of the plot is 508 m2.
The plot is leveled and ready for construction.
Water and electricity are available directly on the plot.
A pit for a septic tank has also been dug on the plot, with concrete blocks installed.
Access road.
Mountain view.
Quiet location.

Additional details

Property type

Land

Object type

Land

Price

25 805 $

Land area

508

Distance to key points, m

To sea 120000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Zabljak; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Zabljak short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (25 805 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Zabljak: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections