Main Countries Buy Rent

House 330 м² in Bar, Montenegro

357 760 $

1 084 $ /м²

4OgX3
Share:

Area

330 м2

Bedrooms

4

House in Bar. City - Bar

The house is located 1.5 km from the center of Bar.
Plot area: 374 sq. m.
House area: 134 m house at the base,
330 m total area of the house,
16 m auxiliary building.


The house is not fully completed, about 80% ready.



Structure:


First floor: commercial premises, basement, utility room, toilet.


second floor: living room, dining room and kitchen, bathroom.


Third floor: 4 rooms and bathroom.


Bathrooms only in rough finishes, as well as rooms, the walls must be plastered on both upper floors.


The house is located 300 meters from the bridge towards Ulcinj.


Status: documents submitted for legalization.

Additional details

Property type

Residential Properties

Number of rooms

4

Object type

House

Price

357 760 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (357 760 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections