Main Countries Buy Rent

House 360 м² in Bar, Montenegro

355 512 $

987 $ /м²

4Octg
Share:

Area

360 м2

Bedrooms

8

House with 4 apartments

House with 4 apartments and 2 workrooms in Ilino

House area 360 sq.m.


Plot area 490 sq.m.


House structure:


One apartment with 3 bedrooms

Two apartments with 2 bedrooms

One apartment with 1 bedroom

All apartments have terraces with views of the mountains and surrounding area.


There are two utility rooms on the plot: 25 sq.m. and 40 sq.m.


Fruit trees grow on the plot

City water + reservoir

Septic tank sewerage.


All infrastructure within walking distance (schools, kindergartens, shops, clinic, public transport stops).


To the sea 1.5 km

To the center of Bar 1.5 km.

Services and facilities

Garage/parking

Additional details

Property type

Residential Properties

Floor

3

Object type

House

Price

355 512 $

Land area

490

Characteristics

Garage/parking

Distance to key points, m

To sea 1500

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (355 512 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections