1 747 201 $
Piran, Slovenia
House overlooking the Adriatic Sea and within walking distance to the beach..Two-family house built in 1973, total area 297 m2, plot of land 700 m2, garage. The house is...
House in Savinja. City - Podcetrtek
Apart-hotel opposite Aqualune water park.
.Tourist complex of 7 apartments (6 apartments and one extra room) with a total area of 620 m 2.
Heating is provided by a new 25 kW heat pump, each apartment also has its own air conditioning. There are also plans for a 35kW power station (consent was granted last year), which will cover most of the electricity costs, and a car charging station.
The facility is in operation and is very well visited and appreciated by guests.
Ideal location - opposite Aqualune water park. and only 400 meters from Terme Olimia.
The Aqualuna Thermal Park is an amusement park - 3000 square meters of water fun for all ages - themed pools, adrenaline slides, animation and comfort for the whole family.
.Additional transaction costs: commission fee 2% + VAT.
(PPT1506Jh1)In Slovenia a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Podcetrtek; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Slovenia finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Slovenia takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Podcetrtek short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (1 732 943 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Podcetrtek: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).