Main Countries Buy Rent

Flat 55 м² in Bar, Montenegro

182 345 $

3 315 $ /м²

4OgLr
Share:

Area

55 м2

Bedrooms

1

Bathrooms

1

Apartment with 1 bedroom in Macedonian village

Apartment with 1 bedroom in Macedonian village, Bar


Apartment area 55m2

Bright comfortable apartment is located on the fourth floor of an apartment building.

Structure of the apartment: hallway, living room-kitchen, bedroom, bathroom, terrace.
The apartment is furnished with modern furniture, appliances.
View of the city.
The area is quiet and close to the center of Bar.

All infrastructure is within walking distance.

To the sea and the beach 1 km.

Services and facilities

Furniture

Additional details

Property type

Residential Properties

Object type

Flat

Price

182 345 $

Characteristics

Furniture

Distance to key points, m

To sea 1000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (182 345 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections